Case Study - Access Stairway

View Product
CASE STUDY
PAGE 1 / 1PANTERO WAREHOUSE SOLUTIONS

THE CHALLENGE

A laboratory customer in Maryland needed a safer and easier way for maintenance personnel to access

rooftop chillers and mechanical equipment

. Regular servicing required dependable rooftop access, and the customer wanted a permanent solution that would make maintenance safer and more efficient.

PANTERO'S SOLUTION

Pantero designed, supplied, and installed a custom galvanized steel access stairway with multiple landings and safety railings. The stair system was designed around the existing building and site conditions to provide maintenance teams with direct rooftop access. Because the system is outdoors year-round, galvanized steel was used for durability and corrosion resistance.
🎯
THE RESULT
  • The customer now has safe, convenient access to their rooftop chillers, making inspections, preventative maintenance, and equipment repairs easier for their maintenance teams.
  • Pantero provided a complete solution from design and engineering through fabrication and installation.
  • Safe Access. Easier Maintenance. Built for the Outdoors.
  • Pantero designs and installs custom industrial access stairs, rooftop access systems, equipment platforms, and mezzanines for laboratories, manufacturing plants, warehouses, and other commercial and industrial facilities.
Slide 1 of 1
Rooftop Chiller Access Stairway | PANTERO | Pantero Blog